In July 2021, in Shuangliu District, Sichuan Province, Weichai Baudouin's 1MW food waste biogas power generation project was officially put into operation.
In September 2020,The Deutz 1MW generator set was installed in Xinjiang, and there has been no power outage so far.
Gas: Calcium carbide furnace exhaust Project location: Inner Mongolia Start-up time: December 2018 Installed capacity: 1.2MW, 2×600kW generators