ROI Analysis for 2MW Natural Gas Power: Comparing 3 Global Scenarios

Investment Scenarios: 2MW Natural Gas Power Generation
Jan 15, 2026

Baseline Technical Parameters (2MW Unit):

  • Power Output: 2 MW

  • Operational Time: 24 h/day (330 days/year)

  • Daily Output: 48,000 kWh

  • Daily Gas Consumption: 12,000 Nm3

Scenario 1: Standard Manufacturing (China or SE Asia)

Optimized for regions with developed gas infrastructure and moderate industrial electricity rates.

1. Financial Assumptions:

  • Grid Electricity Price:0.13 USD/kWh$ (0.90 RMB)

  • Natural Gas Price:0.35 USD/Nm3 (2.5 RMB)

  • Total Investment (CAPEX):$700,000 USD (5 Million RMB)

    (Including Gen-set, gas station, grid-connection, and installation).

2. Annual Performance:

  • Annual Grid Expenditure:$2,000,000 USD$

  • Annual Self-Generation Fuel Cost:$1,390,000 USD

  • Annual Net Savings: $610,000 USD (4.36 Million RMB)

3. Payback Period:

  • 700,000  ÷ 610,000 1.15 Years (approx. 14 Months)

Scenario 2: Data Centers or Mining (High-Tariff Regions)

Optimized for overseas markets (e.g., parts of Europe or the Americas) with expensive commercial rates.

1. Financial Assumptions:

  • Grid Electricity Price:$0.18 USD/kWh$

  • Natural Gas Price:$0.35 USD/Nm^3$

  • Total Investment (CAPEX):$750,000 USD (Base system)

2. Annual Performance:

  • Annual Grid Expenditure:$2,850,000 USD$

  • Annual Self-Generation Fuel Cost:$1,390,000 USD$

  • Annual Net Savings: $1,460,000 USD

3. Payback Period:

  • 750,000  ÷ 1,460,000 0.51 Years (approx. 6 Months)

Scenario 3: Integrated Energy (CHP - Combined Heat & Power)

Optimized for factories requiring both electricity and thermal energy for production or HVAC.

1. Heat Recovery Value:

  • Efficiency Boost: Recovers engine waste heat (exhaust & cooling water), equivalent to saving 8,000 kWh/day in thermal energy.

  • Annual Thermal Savings Value:$335,000 USD (2.38 Million RMB)

2. Total Annual Benefits:

  • Power Savings ($610k) + Thermal Savings ($335k) = $945,000 USD/year

3. Payback Period:

  • 700,000 ÷ 945,000 0.74 Years (approx. 9 Months)

Executive Summary Table

Application ScenarioPayback PeriodKey Financial Driver
Manufacturing14 MonthsSignificant Fuel-to-Power Price Gap
Data Centers/Mining6 MonthsHigh Utility Tariffs Avoidance
CHP (Factory + Heat)9 MonthsWaste Heat Recycling & Efficiency

Conclusion

Compared to traditional grid reliance, a 2MW natural gas power solution offers industrial users a path to full cost recovery within 6 to 15 months. Beyond the rapid ROI, it secures a stable, independent energy supply while significantly lowering the carbon footprint through cleaner-burning fuel and high-efficiency heat recovery.


Inquiry Now