For any facility requiring a 2MW continuous load—such as manufacturing plants, data centers, or mining farms—the choice of power source is a multi-million dollar decision. Based on 330 days of annual operation (7,920 hours), we provide a definitive financial breakdown of the three primary energy paths.
Capacity: 2 MW (Continuous)
Annual Output: 15.84 Million kWh
Scenario: 24/7 heavy-duty industrial operation.
Transforming electricity from a "Passive Expense" into "Asset Arbitrage."
By generating your own power with natural gas, you effectively bypass expensive industrial grid tariffs.
| Metric | Grid Electricity | Natural Gas Generation |
| Cost per kWh | 0.12 USD | 0.075 USD |
| Hourly Cost | 240 USD | 150 USD |
| Annual Savings | — | 712,800 USD |
Investment & Payback: With a total system investment (CAPEX) of approximately 1.2M, the payback period is just 1.7 years. After 20 months, the system enters a "pure profit" phase for the remainder of its 15+ year lifespan.
The high price of convenience: Why Diesel fails as a primary source.
While diesel generators are common for emergencies, their operational expenditure (OPEX) is unsustainable for continuous use. At $1.00/L, diesel power costs roughly 0.25/kWh—over 3.3 times the cost of natural gas.
| Item | Natural Gas | Diesel Power |
| Hourly Fuel Consumption | 500 Nm3/h | 531 L/h |
| Hourly Fuel Cost | 150 USD | 531 USD |
| Annual Fuel Total | 1.18 Million | 4.20 Million |
| Annual Difference | Baseline | +$3.02 Million USD / Year |
| Comparison Metric | Grid Power | Natural Gas (Winner) | Diesel (Backup Only) |
| Energy Cost | 0.12 /kWh | 0.075 /kWh | 0.25 /kWh |
| Fuel/Energy Efficiency | N/A | 38% | 38% |
| Annual OPEX | 1.90M | 1.18M | 4.20M |
| Strategic Role | Standard Supply | Primary Baseload | Emergency Backup |
For 2MW+ continuous loads, Natural Gas Generation is the undisputed champion. It outperforms the grid in cost-per-kWh and eliminates the astronomical fuel expenses associated with diesel.
The Advantages are Clear:
Lowest OPEX: Save 700k+ vs. the Grid and 3M+ vs. Diesel annually.
Rapid Amortization: Full ROI achieved in under 24 months.
Stability: High-reliability power independent of grid fluctuations or diesel price surges.
Inquiry Now