There are currently 25 sets 2MW Deutz natural gas generator containers in the Middle East (with a total installed capacity of 50MW), 18 sets of which have been installed and are operating normally, and 7 sets are being installed. Total run time:32,000hours.
Experts went to Iran projects for on-site guidance